Campus Power Shutdowns - August Long Weekend (August 1, 2, 3)

Scheduled for Aug 1, 08:00 PDT  -  Aug 3, 21:00 PDT

Scheduled

CPF (Campus Planning and Facilities) will be performing high voltage power maintenance as follows:
•North Campus
Sunday Aug 2 only. from 8:00am to 9:00 pm
All network connectivity will be unavailable from the impacted buildings

•South Campus (except SE40, SE41, SE42, SE50)
Saturday Aug 1, Sunday Aug 2, Monday Aug 3


The IT Services Data Centre is located in SE12 and is expected to be fully operational using generator and UPS power during this CPF maintenance.
All systems should be accessible from off campus or from non-impacted buildings however, certain systems and services may be unavailable or may run slower than expected such as:
..Student email
..Banner Admin pages
..Banner Self Service Module
Posted Jul 29, 2026 - 13:09 PDT
This scheduled maintenance affects: myBCIT Webmail (Students, Faculty and Staff) and myBCIT Email (SMTP/IMAP).