South Campus Power Shutdown : Facilities Management
Scheduled Maintenance Report for British Columbia Institute of Technology
Completed
The scheduled maintenance has been completed.
Posted Aug 01, 2020 - 18:00 PDT
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Aug 01, 2020 - 07:00 PDT
Scheduled
Facilities Management has posted an announcement for the South Campus Annual Maintenance of High Voltage Electrical Equipment and upgrading the feed to the BCIT Residence Buildings


Saturday August 1, 2020 –
Power Down 7:00am
Power Up 6:00pm
•All South Campus buildings (SE01, SE02, SE04, SE06, SE08, SE09, SE10, SE12, SE14, SE16, SE30, SW01, SW02, SW03, SW05, SW09 (all rooms)
•All Residence building SW10, SW11. SW12, SW13, SW14, SW15, SW16) (all rooms)
•Excluding SE40/SE41/SE42/SE50/Test Hut.


IT Services staff expect:
• The data centre to remain operational under generator power during the South Campus event (August 1, 2, 3)
• All systems to remain accessible from off-campus or from non-impacted buildings during all events
• All network connectivity to be unavailable from impacted buildings.



Facilities Contact: Mike Mafatow mmafatow@bcit.ca
Posted Jul 31, 2020 - 14:46 PDT
This scheduled maintenance affected: Network Services.