Facilities Management has posted an announcement for the South Campus Annual Maintenance of High Voltage Electrical Equipment and upgrading the feed to the BCIT Residence Buildings
Monday August 3, 2020 –
Power Down 7:00am
Power Up 6:00pm
•SE10/SE14/SE30/SW01 (all rooms)
IT Services staff expect:
• The data centre to remain operational under generator power during the South Campus event (August 1, 2, 3)
• All systems to remain accessible from off-campus or from non-impacted buildings during all events
• All network connectivity to be unavailable from impacted buildings.
Facilities Contact: Mike Mafatow
mmafatow@bcit.ca